Pinecrest BESS

DEVELOPMENT

​The Pinecrest BESS project seeks to provide firmed renewable power in one of the best locations on the grid in NSW.

 

It is proposed to be located approximately 12km north west of Lithgow, between the existing Mt Piper and Wallerawang high voltage substations, and on the previous Pinecrest Solar development footprint.

 

The proposed site is next to existing Transgrid transmission lines.

500 MW

2 Hours

Li-Ion

Battery Storage

Hard Hat.png

Up to 250FTE Construction Jobs

Project Details

Screenshot 2025-09-16 114734_edited.jpg

Up to 500 MW / 1000 MWh with a 25-year operational life

ChatGPT Image May 7, 2026, 11_16_17 AM.png

Energy storage containers and electrical infrastructure to be installed on a 23 ha site near Lithgow.

Image by Thomas Despeyroux

A new ~150m high-voltage overhead transmission line, connected to either existing Transgrid high voltage transmission lines or the new Mount Piper to Wallerawang transmission line.

Banpu Pinecrest.png
Australia Map 2.png

Pinecrest BESS

Benefits

BESS_01.jpg

Stakeholders

The BESS will store up to 1,000 MWh of energy, contributing to grid reliability, storing surplus energy from the grid and releasing it when it is needed.

BESS_02.jpg

Community

The Pinecrest-BESS project enhances community energy efficiency and reliability creating local jobs. It promotes grid stability and supports a sustainable future, driving economic growth and environmental benefits.

BESS_03.jpg

Environment

A renewable energy source, Banpu Energy's  BESS will play a key role in decarbonising the energy sector and supporting Australia’s net-zero goals.